[1]
Karimi, B. and Mohammadpour Omran, M. 2026. A Blockchain-Based Optimization Model for Smart 4PL Network Design in Off-Site Construction. Supply Chain and Operations Decision Making. 3, 1 (Mar. 2026), 76–86. DOI:https://doi.org/10.48313/scodm.v3i1.54.